What We Do

Unless tagged out in the quote the following is included:

  • Remove rubbish from site
  • Remove existing joinery
  • Fix off all joinery with screws
  • Solid pack where fixings are between jamb liner and framing
  • Scribers when required
  • Timber Facings only when specified on the quote
  • Architraves
  • PEF / Foam Rod
  • Expanding Foam or wet seal if foaming isn’t suitable
  • Flashing tape when required
  • Trade Clean

What We Don't Do

The following is company policy:

  • We do not pack the head of the window between the jamb liner and the lintel
  • We do not remove blinds/curtains etc
  • We do not re hang blinds/curtains etc
  • We do not do concrete rendering
  • We do not do painting/putty holes
  • We do not do plastering/Gib stopping
  • We do not replace your cladding unless specified on the quote
  • We do not professionally clean
  • We do not professionally refit carpet when installing doors
  • We do not move your furniture
  • If scaffolding is excluded yet required then the owner must arrange or you will be invoiced for it additionally

Discover Our Hardware Solutions

We offer four distinct ranges - Urbo, Miro, Icon, and Elemental - each featuring a hardware selection tailored to complement various window and door formats, all designed to match your unique style.

LEARN MORE

Why You Should Get Bifold Windows

Maximise the size of the window opening to get the best possible unobstructed view.

LEARN MORE